Contractors equipment floater
Drill rigs, mud mixing and recycling systems, pumps, vac trailers, compressors, locating receivers and trailers that do not belong on the auto policy go on a contractors equipment floater, a form of inland marine coverage.
- Valuation. Actual cash value pays less as equipment ages. Replacement cost or agreed value costs more but avoids a fight after a total loss. Use current values, not purchase price from years ago.
- Underground tools. Bits, reamers, sondes, motors and drill pipe lost in the hole are often excluded or sublimited. Specialty markets write downhole tool coverage. One published program for trenchless drilling underground tools, for example, has a $1 million maximum limit and a deductible of 10% of the loss with a $10,000 minimum. Your terms will differ, but expect deductibles in that shape.
- Rental reimbursement. Pays to rent a replacement rig while yours is repaired, so the crew keeps working.
- Leased and rented equipment. Make sure equipment you rent is covered, and that the rental contract's insurance demands are met.
Installation floater
The conduit, duct or pipe you are installing is not covered by GL while it is your work in progress. Damage during staging, fusing, pullback or before the owner accepts it falls to an installation floater or builders risk. A failed pullback that leaves product stuck in the hole can be a significant first party loss.
Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.
Check my coverageWhat underwriters ask
- Equipment schedule with year, make, model, serial number and value
- Where equipment is stored overnight and how it is secured
- Your largest single item value and the most you have in one place
- Average and maximum product values in the ground at once
- Prior equipment losses including tool losses
Questions contractors ask
Does my equipment floater cover a reamer stuck in the hole?
Should the rig be on the auto policy?
Sources
- Transpac Managers, trenchless drilling underground tool program summary (example of a downhole tool form)
- FERC, Guidance for HDD monitoring, inadvertent return response, and contingency plans (2019)
Sources checked 2026-11-19. Laws and forms change. If a source has moved, call us and we will confirm the current rule.