- One call center
- Dig Safe (dial 811)
- Law
- 30 V.S.A. Chapter 86 (Underground Utility Damage Prevention System)
- Notice before digging
- At least 72 hours, not counting Saturdays, Sundays and legal holidays, and not more than 30 days before excavation (30 V.S.A. 7004(c)).
- Ticket life
- Valid until the excavation is not completed within 30 days, the marks fade or are destroyed, or new facilities are installed in the marked area (30 V.S.A. 7004(e)).
- Tolerance zone
- Approximate location is a strip up to 18 inches on either side of the facility (30 V.S.A. 7001).
- White lining
- Required. Premark the area in white before notifying Dig Safe (30 V.S.A. 7004(b)).
- Positive response
- Not confirmed from an official source. Check with Dig Safe before relying on it.
- Enforcement
- Not confirmed from an official source. Check with Dig Safe before relying on it.
What Vermont contractors should know
- Vermont moved from 48 to 72 hours of notice, matching the other Dig Safe states. Crews used to the old rule will start early.
- Vermont's definition of verified means location and depth were visually confirmed by hand digging, water excavation or other safe means (30 V.S.A. 7001).
How this affects your insurance in Vermont
When a strike happens, the first question is whether your crew followed Vermont's one call law. A valid ticket, a checked positive response and work inside the tolerance zone rules usually shift the cost of a mismarked line away from you. Missing any of them can leave you, and your general liability policy, paying the bill. That is why the records in our pre bore checklist matter in every state.
Your GL also has to cover the strike in the first place. Check for explosion, collapse and underground exclusions with the coverage gap check.
Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.
Check my coverageWorkers comp in Vermont
NCCI state. Conduit and cable work usually rates under class 6325, gas mains under 6319 and sewer work under 6306, with the exact code set by the work done.
See workers comp for boring crews for classification, out of state crews and mods.
Fiber and broadband work in Vermont
NTIA allocated $0.23 billion in BEAD funding to Vermont, with 33,646 unserved locations counted in the allocation, about $6,804 per location. Much of that money becomes underground fiber work for primes and boring subcontractors. See BEAD insurance flowdowns and insurance for fiber boring subs.
Licensing
TAKKEL Insurance, LLC holds an active property and casualty agency license in Vermont, so we can quote and place coverage for Vermont based contractors and for out of state contractors working here.
Questions contractors ask
How much notice does Vermont require before digging?
How long is a locate ticket good for in Vermont?
What is the tolerance zone in Vermont?
Sources
- 30 V.S.A. 7004
- 30 V.S.A. Chapter 86
- American Academy of Actuaries, Workers' Compensation issue brief (Oct 2025)
- NTIA Internet for All, BEAD state allocation totals
Sources checked 2026-11-19. Laws and forms change. If a source has moved, call us and we will confirm the current rule.