Connecticut's one call law, comp system and broadband build numbers, sourced and written for contractors who bore, trench and pothole for a living.

One call center
Call Before You Dig (CBYD) (dial 811)
Law
Connecticut General Statutes Section 16-345 and following; Regulations of Connecticut State Agencies Section 16-345-1 and following
Notice before digging
At least two full days, not counting Saturdays, Sundays and holidays, and not more than 30 days before excavation (RCSA Section 16-345-4(a)(1)).
Ticket life
30 days from the day notice is given, not from the start date. Renewals need two full working days (CBYD).
Tolerance zone
Approximate location is a strip up to 3 feet wide centered on the facility, or up to 1.5 feet on either side of it (CGS Section 16-345).
White lining
Not confirmed from an official source. Check with Call Before You Dig (CBYD) before relying on it.
Positive response
Utilities respond to the excavator with their locate status, and responses show in CBYD's e-Ticket system.
Enforcement
Public Utilities Regulatory Authority (PURA), Gas Pipeline Safety Unit. Civil penalty criteria are in RCSA Section 16-345-9.

What Connecticut contractors should know

  • The call requirement applies to everyone digging with power operated equipment.
  • Because the ticket clock starts on the notice date, a job that slips a few weeks can expire before the first bore.

How this affects your insurance in Connecticut

When a strike happens, the first question is whether your crew followed Connecticut's one call law. A valid ticket, a checked positive response and work inside the tolerance zone rules usually shift the cost of a mismarked line away from you. Missing any of them can leave you, and your general liability policy, paying the bill. That is why the records in our pre bore checklist matter in every state.

Your GL also has to cover the strike in the first place. Check for explosion, collapse and underground exclusions with the coverage gap check.

Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.

Check my coverage

Workers comp in Connecticut

NCCI state. Conduit and cable work usually rates under class 6325, gas mains under 6319 and sewer work under 6306, with the exact code set by the work done.

See workers comp for boring crews for classification, out of state crews and mods.

Fiber and broadband work in Connecticut

NTIA allocated $0.14 billion in BEAD funding to Connecticut, with 11,693 unserved locations counted in the allocation, about $12,331 per location. Much of that money becomes underground fiber work for primes and boring subcontractors. See BEAD insurance flowdowns and insurance for fiber boring subs.

Licensing

TAKKEL Insurance, LLC holds an active property and casualty agency license in Connecticut, so we can quote and place coverage for Connecticut based contractors and for out of state contractors working here.

Questions contractors ask

How much notice does Connecticut require before digging?
At least two full days, not counting Saturdays, Sundays and holidays, and not more than 30 days before excavation (RCSA Section 16-345-4(a)(1)).
How long is a locate ticket good for in Connecticut?
30 days from the day notice is given, not from the start date. Renewals need two full working days (CBYD).
What is the tolerance zone in Connecticut?
Approximate location is a strip up to 3 feet wide centered on the facility, or up to 1.5 feet on either side of it (CGS Section 16-345).

Built by people who came from utility construction

Before the next bore, know exactly what your policies will pay for.

Or call 563.321.2430. TAKKEL Insurance, LLC, De Witt, Iowa.

Call 563.321.2430Get a quote