- Additional insured
- A party added to your policy, usually by endorsement, so it is covered for claims arising from your work.
- APWA uniform color code
- Marking colors for underground facilities: red electric, yellow gas and oil, orange communications, blue potable water, purple reclaimed water, green sewer, white proposed excavation, pink temporary survey.
- Auger boring (jack and bore)
- Installing a casing from a launch pit with a rotating auger inside it, usually under roads and railroads.
- Builders risk
- Property insurance for a project under construction, including materials not yet accepted by the owner.
- CGA DIRT
- The Common Ground Alliance's Damage Information Reporting Tool, an annual analysis of damages to buried facilities.
- Completed operations
- Coverage for injury or damage arising from your work after it is finished.
- Contractors pollution liability
- Coverage for pollution conditions arising from a contractor's operations, such as drilling fluid releases.
- Cross bore
- A utility line installed through another underground line, most often a gas line through a sewer lateral.
- Daylighting
- Exposing a buried utility to see it, usually by vacuum excavation or hand digging. Also called potholing.
- Experience mod (EMR)
- A factor comparing your comp losses to expected losses for your payroll and classes. Primes use it to prequalify contractors.
- Frac out
- Common term for an inadvertent return of drilling fluid to the surface.
- HDD
- Horizontal directional drilling: a steerable trenchless method that drills a pilot bore, reams it and pulls back product.
- Inadvertent return
- Drilling fluid escaping to the surface or a waterway through a path other than the bore.
- Installation floater
- Inland marine coverage for materials you are installing until the owner accepts the work.
- Microtunneling
- Remote controlled, guided pipe jacking used for precise line and grade, often for sewers.
- Pipe bursting
- Breaking an existing pipe in place and pulling a new pipe into the same path.
- Pneumatic piercing tool
- An unguided air hammer tool, often called a missile, used for short service bores.
- Positive response
- A system where each utility on a ticket reports whether it marked, cleared or needs more time.
- Primary and noncontributory
- Endorsement language making your policy pay first for an additional insured without seeking contribution from its insurance.
- Railroad protective liability
- A policy bought by a contractor in the railroad's name for work on or near railroad property, ISO form CG 00 35.
- Split point
- The dollar amount where a comp claim is divided into primary and excess portions in the experience mod.
- Ticket life
- How long a locate request stays valid under state law.
- Tolerance zone
- The area on either side of a marked facility where state law requires hand digging or other careful methods.
- Underground resources and equipment
- An ISO coverage endorsement (CG 22 62) addressing damage to underground resources and equipment.
- Waiver of subrogation
- An agreement that your insurer will not seek recovery from another party after paying a claim.
- White lining
- Marking the proposed excavation area in white before a locate, required in many states.
- XCU
- Explosion, collapse and underground property damage hazards. Covered by the standard CGL unless removed by endorsement such as CG 21 42 or CG 21 43.
Sources
- PropertyCasualty360 FC&S, explosion, collapse and underground exclusions
- Wisconsin Statutes 182.0175 color code
- FHWA, trenchless technology methods (utility cuts manual, chapter 4)
- PropertyCasualty360 FC&S, railroad protective liability insurance
- NCCI, ABCs of Experience Rating
- FERC, Guidance for HDD monitoring, inadvertent return response, and contingency plans (2019)
- Cabling Installation & Maintenance, CGA 2025 DIRT key findings (Aug 2026)
Sources checked 2026-11-19. Laws and forms change. If a source has moved, call us and we will confirm the current rule.