Plowing
Vibratory and static plows are common on rural fiber routes. A plow blade does not slow down when it meets a shallow service or drain tile, so locate quality and potholing at crossings decide the loss record. Farm drain tile damage claims are common on rural builds and are usually property damage under GL.
Micro trenching
Micro trenching cuts a narrow slot in pavement and backfills it. Municipal permits often set depth, restoration and warranty terms. Failures in the restoration show up as completed operations claims or as permit bond claims. Shallow existing lines in the pavement section, such as traffic loop wires and street lighting, are frequent strikes.
Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.
Check my coverageCoverage notes
- GL without underground exclusions, and enough products and completed operations aggregate for restoration claims
- Commercial auto that schedules the plow tractors and trencher trucks that travel on public roads
- Equipment coverage for plows, trenchers and cable trailers that are not auto
- Permit and maintenance bonds where municipalities require them
- Comp payroll split so trenching and cable placement are not mixed with aerial work
Sources
- Cabling Installation & Maintenance, CGA 2025 DIRT key findings (Aug 2026)
- OSHA 29 CFR 1926.651, specific excavation requirements
Sources checked 2026-11-19. Laws and forms change. If a source has moved, call us and we will confirm the current rule.