- One call center
- JULIE (Illinois One Call) (dial 811)
- Law
- 220 ILCS 50 (Illinois Underground Utility Facilities Damage Prevention Act)
- Notice before digging
- Not less than 48 hours and not more than 14 calendar days before the start (Section 4(d)). JULIE tells excavators to plan on calling at least 3 days before digging.
- Ticket life
- A project running past 28 calendar days from the original notice needs a subsequent notice, which is good for another 28 days (Section 4(g)).
- Tolerance zone
- Approximate location is a strip at least 3 feet wide that extends 1.5 feet on either side of the facility (Sections 2.7 and 2.8). Hand dig or vacuum excavate within 18 inches.
- White lining
- Use white paint, flags or stakes to outline the dig site if practical. Black is allowed when snow is on the ground (Section 4(c)).
- Positive response
- Owners must mark within 48 hours or by the requested time, whichever is later, and owners with no facilities must still tell the excavator. Where there is clear evidence of an unmarked line, wait 2 hours after an additional call (Section 4(h)).
- Enforcement
- Illinois Commerce Commission. Up to $5,000 per offense for willful failure to give notice and up to $2,500 per offense for willful noncompliance after notice (Section 11).
What Illinois contractors should know
- Refresh requests are only allowed when the project started within 10 calendar days of the first request (JULIE).
- IDOT, the Illinois Toll Highway Authority and railroads are not JULIE members, so work in their right of way needs separate contact (JULIE).
How this affects your insurance in Illinois
When a strike happens, the first question is whether your crew followed Illinois's one call law. A valid ticket, a checked positive response and work inside the tolerance zone rules usually shift the cost of a mismarked line away from you. Missing any of them can leave you, and your general liability policy, paying the bill. That is why the records in our pre bore checklist matter in every state.
Your GL also has to cover the strike in the first place. Check for explosion, collapse and underground exclusions with the coverage gap check.
Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.
Check my coverageWorkers comp in Illinois
NCCI state. Conduit and cable work usually rates under class 6325, gas mains under 6319 and sewer work under 6306, with the exact code set by the work done.
See workers comp for boring crews for classification, out of state crews and mods.
Fiber and broadband work in Illinois
NTIA allocated $1.04 billion in BEAD funding to Illinois, with 239,688 unserved locations counted in the allocation, about $4,341 per location. Much of that money becomes underground fiber work for primes and boring subcontractors. See BEAD insurance flowdowns and insurance for fiber boring subs.
Licensing
TAKKEL Insurance, LLC holds an active property and casualty agency license in Illinois, so we can quote and place coverage for Illinois based contractors and for out of state contractors working here.
Questions contractors ask
How much notice does Illinois require before digging?
How long is a locate ticket good for in Illinois?
What is the tolerance zone in Illinois?
Sources
- 220 ILCS 50 (Justia)
- JULIE FAQ
- American Academy of Actuaries, Workers' Compensation issue brief (Oct 2025)
- NTIA Internet for All, BEAD state allocation totals
Sources checked 2026-11-19. Laws and forms change. If a source has moved, call us and we will confirm the current rule.