TAKKEL InsuranceUnderground contractor insurance

Boring under railroads and highways: insurance and permit checklist

Railroads and DOTs control their crossings tightly. Their insurance requirements are specific and usually non negotiable.

Railroad crossings

  • Railroad protective liability, ISO form CG 00 35, issued in the railroad's name
  • Contractual liability for railroads on your GL, CG 24 17 or CG 24 27, because the standard insured contract definition excludes construction within 50 feet of a railroad
  • Additional insured status for the railroad on your policies when required
  • Right of entry agreements and railroad flagging costs

Wisconsin DOT's design manual lists railroad protective as required when work is within 50 feet of railroad property, including extending or constructing underground drains or sewers on railroad right of way.

Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.

Check my coverage

Highway crossings

  • DOT utility permits with depth, casing and restoration requirements
  • Permit bonds or deposits
  • Additional insured for the DOT or county where required
  • Traffic control plans and the auto and GL exposure that goes with them

Built by people who came from utility construction

Before the next bore, know exactly what your policies will pay for.

Or call 563.321.2430. TAKKEL Insurance, LLC, De Witt, Iowa.

Call 563.321.2430Get a quote