Each policy has its own rating base
| Policy | Usual rating base | Main price drivers for boring work |
|---|---|---|
| General liability | Payroll or revenue by class | Underground methods, strike history, XCU coverage, limits, subcontracted work |
| Workers comp | Payroll per $100 by class code | Class code, state, experience mod, payroll splits |
| Commercial auto | Per vehicle | Vehicle type and weight, radius, drivers' records, losses |
| Equipment floater | Rate per $100 of scheduled values | Values, deductible, underground tool coverage, theft exposure |
| Contractors pollution | Revenue or flat minimum | Operations, limits, disposal and transportation coverage |
| Umbrella | Priced off the underlying | Limits, underlying losses, exclusions |
What underwriters weigh
- Years in business and years doing underground work specifically
- Mix of methods, depth, bore length and share of work under roads, rivers or rail
- Strike frequency and how you document locates and potholing
- Loss runs for five years, including open reserves
- Who you work for and the contracts you sign
- Use of subcontractors and whether you collect their certificates
- Safety program, training and your experience mod
Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.
Check my coverageA worked example (illustrative only)
These numbers are assumptions chosen to show the math. They are not rates, quotes or averages.
Assumptions: a fiber boring contractor with $1,200,000 of field payroll in class 6325 and $150,000 of clerical payroll. Assume a comp rate of $6.00 per $100 for 6325 and $0.20 per $100 for clerical, an experience mod of 0.90, and no other credits or fees.
6325: $1,200,000 / 100 x $6.00 = $72,000
Clerical: $150,000 / 100 x $0.20 = $300
Manual premium: $72,300
Modified premium: $72,300 x 0.90 = $65,070
If that same contractor's mod were 1.25 after a bad year, modified premium would be $72,300 x 1.25 = $90,375. Same work, same payroll, $25,305 more.
Two things in that example are in your control: the mod, through claim frequency and claim handling, and the payroll split, through good time records. See comp cost for boring crews.
Ways to lower cost without losing coverage
- Market the account to carriers and programs that actually want underground work
- Choose deductibles you can carry, especially on equipment and auto physical damage
- Clean up class codes and payroll records before audit
- Close or challenge stale open reserves on loss runs
- Show your potholing, ticket and bore log process in the submission
Questions contractors ask
Can you give me a ballpark over the phone?
Sources
- NCCI, ABCs of Experience Rating
- Tennessee Department of Commerce and Insurance, contracting class codes list
Sources checked 2026-11-19. Laws and forms change. If a source has moved, call us and we will confirm the current rule.