Building a frac out response plan your insurer will like

Regulators and owners increasingly require written inadvertent return plans. A good one also shows an underwriter you can contain a release before it becomes a large claim.

What the guidance covers

FERC's 2019 guidance describes the components of an HDD plan: drilling fluid composition and management, monitoring procedures, operational conditions and response actions, response to inadvertent returns, restoration, and contingency plans if the crossing fails. Pennsylvania DEP's template for trenchless utility lines and Maryland's model frac out plan for wetland licenses follow similar outlines.

Plan contents

  • Drilling fluid products used, with safety data sheets
  • Monitoring: who watches returns and the surface, and how often
  • Thresholds that trigger a stop, such as loss of returns
  • Containment materials staged on site
  • Notification list and timing: owner, inspector, regulators
  • Cleanup, disposal and restoration steps
  • Contingency if the crossing has to be abandoned

Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.

Check my coverage

Line it up with your insurance

  • Your pollution policy should pay the cleanup the plan requires
  • Disposal of recovered fluid should be covered under transportation and nonowned disposal site coverage
  • Abandoned crossings and redrills are first party costs, often uninsured, so price them into the job

Built by people who came from utility construction

Before the next bore, know exactly what your policies will pay for.

Or call 563.321.2430. TAKKEL Insurance, LLC, De Witt, Iowa.

Call 563.321.2430Get a quote