Permits and plans
Crossings of regulated waters often require state and federal permits with an inadvertent return plan attached. Pennsylvania's Schuylkill River HDD project, for example, paired its HDD contingency plan with a state water obstruction and encroachment permit and a U.S. Army Corps of Engineers permit. Maryland's wetlands licenses use a model frac out contingency plan.
Subaqueous rules in state 811 laws
North Carolina and South Carolina require longer notice near subaqueous facilities, 10 to 20 full working days, and set a 15 foot tolerance zone on each side of a subaqueous facility.
Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.
Check my coverageInsurance
- Contractors pollution covering inadvertent returns into water, with cleanup
- Installation floater for the product string
- Equipment coverage for tooling and the mud system
- Limits that match the owner's specification and permit conditions
Sources
- Pennsylvania DEP, Schuylkill River HDD contingency plan
- Maryland Board of Public Works, model HDD frac out contingency plan
- North Carolina General Statutes Chapter 87 Article 8A
- South Carolina Code Title 58 Chapter 36
- FERC, Guidance for HDD monitoring, inadvertent return response, and contingency plans (2019)
Sources checked 2026-11-19. Laws and forms change. If a source has moved, call us and we will confirm the current rule.