HDD river and wetland crossings: permits, plans and insurance

Water crossings combine the highest consequence of a frac out with the strictest permits. Plans and policies need to agree before mobilization.

Permits and plans

Crossings of regulated waters often require state and federal permits with an inadvertent return plan attached. Pennsylvania's Schuylkill River HDD project, for example, paired its HDD contingency plan with a state water obstruction and encroachment permit and a U.S. Army Corps of Engineers permit. Maryland's wetlands licenses use a model frac out contingency plan.

Subaqueous rules in state 811 laws

North Carolina and South Carolina require longer notice near subaqueous facilities, 10 to 20 full working days, and set a 15 foot tolerance zone on each side of a subaqueous facility.

Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.

Check my coverage

Insurance

  • Contractors pollution covering inadvertent returns into water, with cleanup
  • Installation floater for the product string
  • Equipment coverage for tooling and the mud system
  • Limits that match the owner's specification and permit conditions

Built by people who came from utility construction

Before the next bore, know exactly what your policies will pay for.

Or call 563.321.2430. TAKKEL Insurance, LLC, De Witt, Iowa.

Call 563.321.2430Get a quote