TAKKEL InsuranceUnderground contractor insurance

OSHA Subpart P and the HDD bulletin: what applies to boring crews

HDD is trenchless, but it still has pits, potholes and the same duty to find utilities before you hit them.

Locating utilities

29 CFR 1926.651(b) requires the estimated location of utilities to be determined before opening an excavation, utility owners to be contacted within established response times, and exact location to be determined by safe and acceptable means as excavation approaches. If owners cannot respond within 24 hours, unless state law allows longer, or cannot establish the exact location, the employer may proceed with caution using detection equipment or other acceptable means.

The HDD bulletin

OSHA's 2018 safety and health information bulletin on avoiding underground utilities during HDD says a contractor must use the state's utility location system before any drilling, and recommends multiple identification and verification methods because visibility is more limited than in vertical drilling. It notes that the risk of striking gas or electric lines increases in urban areas.

Want this checked against your actual policies?Send your dec pages and one prime contract. A licensed agent will tell you where you are exposed. Free, no obligation.

Check my coverage

Pits and potholes

Entry and exit pits and potholes are excavations. Protective system, competent person and access requirements apply based on depth and soil.

Why it matters for insurance

Compliance records support your defense in liability claims and help hold down comp losses, which drive your experience mod.

Built by people who came from utility construction

Before the next bore, know exactly what your policies will pay for.

Or call 563.321.2430. TAKKEL Insurance, LLC, De Witt, Iowa.

Call 563.321.2430Get a quote